On behalf of the Ontario Heritage Trust, DWA worked with Entuitive Engineering’s Building Envelope Team to replace the roofing on Toronto’s famed Elgin and Winter Garden Theatre. Unique design challenges included a complex schedule of performances that had to be accommodated, considerable mechanical equipment already in place, and very tight site constraints – the theatre fronts onto Yonge Street, and is partially enveloped by the construction site for an adjacent high-rise residential building. Additionally, DWA provided heritage advice within the design team, ensuring that the new roofing design was sensitive to the building’s heritage status.

CLIENT:

Ontario Heritage Trust

SIZE:

28,000 sq.ft.

LOCATION:

Toronto, Ontario

SECTOR:

Cultural/ Heritage

SCOPE:

Technical Consulting for New Roof Membrane

DATE:

Completed 2017